OK - I know I'm lazy . . . I copied and pasted this post from my regular blog. I also know that some of you may not visit over there, so here it is again.
One more thing that I should have done before committing to the "wild" number that I have signed on for is to see what logical number other people were committing to . . . oops! I may be way out there with my plans . . . hope not though because these things need moved out'a here!
The following is my list of shame . . .
#1
This was a mystery quilt that I have been working on and it still requires one more border with some appliquéd words on it. Need to find the right print for that final border though, so that will require a shopping trip.
#2
The borders have been decided for this one and just need to be cut and attached. Also have plans for another quilt using the scraps from this one – we won’t include that one in the PhD challenge though!
#3
This was from a class that I took about 4 years ago and it has been hanging in my quilt room ever since. The border fabrics are bought and just need sewn on. I think what stopped me four years ago from finishing this one was that I didn’t know how to machine quilt back then . . . or if I did, I didn’t have the confidence to dive into this one. Now I think I know what I want to do and I’m going to commit to getting this off my sewing room wall and hung up where it was intended to go in the first place.
#4
Is the Hopscotch pattern . . . and
I don’t like my fabrics! BUT . . . I’m going to commit to getting it done. The wool is all picked out and sitting on my cutting table to make the appliqués and then get her layered up and quilted . . . I have six months after all – right??
#5
The backing fabric came for this just before Christmas so I’m ready to get this one done also . . . just need the time.
#6
This one was a workshop that I had taken a couple of years ago now. Just last month I pulled out all the pieces and put the blocks together and then the quilt top . . . all ready to layer and quilt.
#7
This was supposed to be a tree skirt for this Christmas. Once again – not happy with the colors I chose, but the backing fabric has arrived and it is ready to be layered and quilted also.
#8
Here’s an easy one (I think!) . . . The appliqués are all done up and ready to be stitched down and then it’s ready to layer up and quilt and tuck away for October, 2011. I’m going to be ready for Halloween this year!
#9
This is a Sipiweske original and I don’t know where I went off the rails with this one but it’s been almost four years since it was started. It has never been tucked into a drawer though . . . it remains out in plain view to taunt me for my procrastinating ways. It’s time I showed it who’s boss!!!!
So there we have it . . . “9”, NINE – I tell you, NINE projects half done . . . can I really do it? I'll need some help from the sidelines to keep me on track, so let's all cheer each other on. Good luck to everyone!!!
************